Categories

Up dates to the shop

Life at the shop has changed a bit since our last shop up date. We now have a wire EDM as well as a sinker EDM. I priced out wire EDM work and for the cost of a few pieces I could buy an older unit. It was working on the shop floor prior to […]

Weekend up date 3-23-15

Busy weekend. A number of small and large projects were completed this weekend so lets get to the list.

The first was completing the painting in the fab shop. This is what it looked like.

And this is how it looks now.

I hope to work on the last of the lighting next weekend.

The […]

Weekend update

First things first. I am dog beat tired. I will post pictures later about everything. Changes were made to the wood shop, solid models were done and a new rifle rack was worked on.

So lets start at the beginning. Saturday was spent with the computer system that I could not get to work correctly […]

Fluting machine up date

More work has been completed on the fluting machine.The tool holder and guide pin have been machined and installed.

A close up of the tool holder with the broaching tool installed.

The 3 jaw chuck has been machined for the barrel to fit into.

Next on the list is finish the hydraulics and […]

Fun at Gun Lab Week end of 3-8-15

Not everything is as much fun as this was.

My old back hoe started leaking oil on two of the cylinders. So the project for Sunday was to remove the cylinders to take them down to the hydraulic repair shop. As with all plans things just do not go as easy as they sound. […]

Weekend update 1-5-15

Well the new year is here and the holidays are over. It is time to get back into the routine of life. This last week was just that but a little longer. The first on the list was the honeydo’s project. My wife wanted a new kitchen faucet for Christmas ,seeing how the old one […]

Weekend Update 11-24

Well as usual it has been a busy weekend around Gun Lab. More parts have been made for the VG1-5, coming soon in a post. The big project was the water system. The pressure pump took a crap. It just turn the pump room into a swamp and need to be fixed in a bad […]

Making the VG1-5 cocking handle

In the following pictures of original VG1-5 one of the items that you will notice is that all the cocking handles look different and that they have been through some rough times.

 

 

So this is the cocking handle that we developed. The first thing that you will […]

Weekend update 11-17

As always there is to much to do and not enough time to complete all of it. First is the update to the addition to the wood shop. The door is hung and the roof is up. The roof and sides are epoxy and fabric covered, for the most part. One more day and I […]

More work on the fluting press.

I had a little extra time this morning so out to the shop it is. Wrote the program and go the mill warmed up and spent my free hour cutting out the guide slot for the fluting machine. Here is a quick video of the process.

A couple of pictures.

Another step closer […]