Mondays update 10-27

With the SAR show coming up quick the main push at Gun Lab is to finish out the VG1-5 project. Not all the rifles will be built prior to SAR, but the parts will be completed and the first 3 rifles will be completed. That is my goal at least. So right now we are […]

Saturday update

I am a little behind just coming back from a 10 day trip through the mid west states. So today was a work day in the shop. The major projects right now are finishing all the parts for the VG1-5, you know the hole that needs to be drilled or the slot that needs to […]

Tuesday shop pictures

What a shop to work in. And to think that the people that work in my shop complain about the working conditions.

I just don’t want to hear about the benches not being the right height or that we need a new cnc machine.

[…]

Shop Tuesday 10-8 fluting machine

We are working on all the components for the barrel fluting machine. This is the Master Cam video for the making of the lower base. This part allows the chuck plate to move in and out. This allows us to load and unload the barrels from the chuck.

This part has now been machined.

[…]

Working on the fluting press

This video is the first op on the back plate of the barrel fluting machine. In this video we are drilling and reaming the hole necessary to hold the plate to the table of the milling machine and align the plate for the next op. This will allow us to remove the exterior clamps and […]

Thursday”s post more on the fluting machine

After a 14 hour work day my energy level is in the toilet. We have been working on the fluting machine so here are a few pictures of the parts as they currently stand.

If I get home at a reasonable time tonight I will make a complete post on the parts […]

Monday update 9-29

The 1″ steel plate that we cut up last weekend has been cut down to size and then sized in the HAAS to actual specs.

This is all that is that is remaining of the steel sheet that we started with.

All of this material will be used on the fluting machine.This is what […]

Monday update 9-22

Well the fab shop new addition is now framed up and ready for a concrete pour. With any luck I will have the concrete completed in October.

This weekend is also honey-do weekend as well. The tile needed to put down in the hallway and bathroom and the new lighting installed. This […]

Wednesday More designing on the fluting press

We have finished what I think is the last of the designing work on the chamber fluting press. Next week after the die is off the HAAS machine we will start machining the individual components. So here is the final design.

We added a guide rod to insure that the tool head will […]

Friday video 9-12-14

For this Friday video we are using the new knurling tool that we modeled and built in the shop. This tool is a much better design and safer to use than the Shars tool I purchased. Here are a few pictures of it to give you an idea of the design.

This is how […]