In the post I talked about the trip to the storage shed. This pile of stuff came about because I just asked. I was doing a job for a home owner and in the back yard was this pile.

The home owner said she wanted it gone. So at my house sets to kilns […]

Being a “HOARDER” part 1

A good friend of Gun Lab recently mention that I am or might be a hoarder. I think of myself as someone that is very good at re-purposing material and equipment. Working on a limited budget I am always trying to make do with little or no money. In my normal job I am at […]

Weekend update

This was a weekend of building and equipment repair. The air system went out on the Sharps machining center. So out with the old and a completely new regulator, filter and oiler went on.

The switch went out on the grinder, new switch time. To attach it to the pedestal, the previous owner used […]

Working on the hot forging press

Part of this last weekend was spent working on the hydraulic forging press and the fluting machine for the VG1-5. I started by threading all or at least most of the 3/4 high pressure hydraulic piping necessary. This is a video for the project.

With the hard piping completed all the old hoses were […]

Weekend update 2-14-16

Not much fun stuff this weekend. Work was accomplished in the machine shop by adding even more new led lights.

New lights were installed over the HAAS and Sharps machining centers.

Installed one over the cnc lathe.

Went back and re-mudded the ceiling where we put the lights earlier.

I spent time working on the […]

Weekend update for 6-15-15

A quick update for this last weekend. The slab was finished at the cast area. Here are a couple of views. I still need to get the gantry system up, but I am going to wait for my good friend Mac to help me with that one. He is a much better welder and fabricator […]

Weekend update 5-31-15

Now as much to chat about this weekend. Spent most of Saturday machining the AR-180B selector second op. The second op is now complete and we will be setting up the Sharps for the third op. The material and tooling is in to start on the safety shaft on the lathe then the pivot button […]

Gun Lab update

Not a big post for today, just an update on the projects we are working on.

First and most important is the VG1-5 project. I received a call this afternoon late that the firing pins can be picked up from the heat treating firm. With this last piece we can send the second rifle to […]

Weekend update 5-11-15

Most of this weekend was spent taking pictures for up coming write ups and going through some 1480 scans, I just got back from the scanning company, to organize them. But, some other projects were accomplished as well. The first was a new pad for the a/c unit for the cnc room. The compressor is […]

Updates for the last two weekends.

Last Sunday was a much easier day. It was a large amount of fixing things as well as shop work.

The A/C went out in the house so testing was conducted and it was found that the evaporator fan went out. Time was spent on removing it to get a replacement today. Then the bad […]