We have just completed the first operation 6 on the trunnion. It has also pointed out a few minor differences. When we started this project all we had was an original trunnion in very bad condition and a collection of out of spec drawings with incorrect dimensions.




Later a trunnion in very good condition showed up from a friend to help move this project along.



So as we have gone through each step of the process of reverse engineering a MP-44 trunnion and making a series of them we correct our solid model and it’s dimensions have rewritten and the machining program changed as well. This is the trunnion as completed on the first sample of op.6. There is a great deal that is correct with this sample, however there are more changes to be made.
The top radius for the gas tube needs to be looked at.
All the machined dimensions are correct.
The angle and radius for the magazine to fit in is spot on
Just check out the finish. These will be perfect when they go out.

The finish on the upper radius is perfect.

So now on to the changes that have to be made. The first is that we have to machine down the side a little more.
A greater radius needs to be added.
We took of a little to much.
We mark each trunnion this allows us to keep track of each change as we make it from trunnion to trunnion. This is the first trunnion that we made.
This is the second trunnion. The magic marker notes the size of the chamfer.



One more sample to finish to correct the last of the small items.