MP-44 trunnions finish op 6

We have finished operation 6 on the MP-44 trunnions. The reason that we started with 6 samples was to insure that we would have correct samples when we finished. Two of the trunnions ended up out of spec after we finished this operation. The drawings and cam programing were changed to correct and problems. These are the pictures of the remaining 4 on there was to op. 7.

IMG_0224cs

IMG_0223s

IMG_0225cs

IMG_0226sThere is still deburing that needs to be done then to the last op on the machining center.