On our last update we discussed the newly design disconnector, http://gunlab.net/update-on-the-vg1-5-project/.
With this new disconnector we have now hand fitted all the fire control groups. Once this task was completed we then took apart all the fire control groups to do the last heat treating.
Disconnectors
This now finishes the last of the fire control group parts manufacturing. So the components that are finished are as follows.
The complete fire control group
The upper receiver and bolt assembly as front support
The lower receiver
Currently we are working on finishing the rear top cover, some welding is required and then hand fitting it.
Soon it will be down to the stock and hand guard and then flute the barrel.
Leave a Reply