This is a quick update on the progress of the VG1-5 project.

All the bolts back from heat treat

DSC_7877sAll the hammers back from heat treat

DSC_7878sMagazine pressings for both the right and left sides of the magazine complete, next is to mill of the excess.

DSC_7879sWeld up the fire control box

DSC_7882sSpot welded the rear stock supports and tack in the rear barrel support cross pin.

DSC_7883sComplete the welding of the cross pin.

DSC_7904sPerforming the next two ops on the barrel

DSC_7881s

DSC_7880sWe have started chambering the barrels. The next step is to cut in the threads.

DSC_7905sUpdate video.