Work has been progressing on the fab shop even if at a slower pace then I like. Time and weather has been a real issue.
The roof has been coated twice so we are water tight.
All the wall have been put up,
I have started installing the electrical boxes.
Wiring will be next weekend after I drill all the holes.
Part of the out side walls have now been coated as well.
I have decided to use stainless mesh instead of glass windows. This will help with air flow.