Work has been progressing on the fab shop even if at a slower pace then I like. Time and weather has been a real issue.

The roof has been coated twice so we are water tight.

DSC_4096sAll the wall have been put up,

DSC_4102sI have started installing the electrical boxes.

DSC_4322sWiring will be next weekend after I drill all the holes.

Part of the out side walls have now been coated as well.

DSC_4325sI have decided to use stainless mesh instead of glass windows. This will help with air flow.

DSC_4321sMore next weekend.

 