Saturday was spent working on the deck for phase 2 of the library. All new 2×10’s were set in place and 1″ tongue and grove plywood set in place.
With the deck in place there are a couple of small issues that need to be address then the walls for the porch and phase 2 of the library will be built.
The new library floor was acid etched. The next step is to per-treat the floor for the epoxy coating.