Update for the week ending 2-1-14

So we will start with the update on the VG1-5 project. I stamped the rear top covers.Out of the 10 that were stamped.third flat style (4)s

We found a few problems. I had to re-stamp the parts due to not getting the ribs deep enough.

IMG_0717swThis is a close up of the stamping.

IMG_0718sw

 

Once I re stamped them they looked good for the next step. This showed us that we need to change the basic design again. I hope to have those flats this next week. It should be the last change. Once verified I will stamp all of them. I will be glade to finish these parts. I need to get on to other parts that need stamping. This is a quick picture of the top cover installed on our prototype rifle.

IMG_0739s

IMG_0738sIMG_0737s

 

On to other things completed this week/weekend. We have made a new machining fixture for the hammers. The previous one had tolerance issues. We also have to re-ream the pivot hole on the hammers. They were undersized. Not a big set back, just another day reworking parts. To allow us to re-ream the hole we are using a real basic fixture that has been dialed in on the Webb mill. A pile of hammers to re-work.

IMG_0210sThis is the set up.

IMG_0741sBy using the round part of the hammer in the v portion of the vise and the flat of the hammer against the solid vise jaw I can get repeatably. This vise will set inside my kurt viseĀ  be zeroed in.

More work was completed on the fab shop. I have finished the windows and outside of the wall.

IMG_0734s

The inside which will also be covered with osb is about 50% completed.

IMG_0733s

I finished the frame for the evap cooler and hope to have it up and running before the summer season.

IMG_0742s

8 comments to Update for the week ending 2-1-14

Leave a Reply to ecox762 Cancel reply

  

  

  


*

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>