Categories

Machining the Sudanese lower receiver op.2 and op3

With op 1 completed it is now time to work on op 2 and 3. First a fixture needed to be machined to hold the machined receiver to all finishing the other side.

IMG_1845-aThe machined op1 piece was set in the fixture and tighten down

IMG_1846All the holes were drilled in op1 so now the bottom was milled off and the receiver was contoured.

IMG_1850

IMG_1851When the second side was complete receiver was removed and debured and parts were checked for proper fit,

 

IMG_1852 IMG_1853The magazine release was checked for proper fit.

IMG_1856Op 3 was conducted, out of house, This is where the magazine housing was edm. it was then checked with a number of magazines to verify proper fit.

Screenshot 2026-02-03 095759

Screenshot 2026-02-03 095838

Screenshot 2026-02-03 095906Next post will be about op4

Leave a Reply

  

  

  


*

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>