<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>GunLab (KnownHost) &#187; Weekend follow up Monday</title>
	<atom:link href="https://gunlab.net/category/weekend-follow-up-monday/feed/" rel="self" type="application/rss+xml" />
	<link>https://gunlab.net</link>
	<description>Adventures in gun building!</description>
	<lastBuildDate>Fri, 03 Apr 2026 17:06:41 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.1.41</generator>
	<item>
		<title>Weekend update</title>
		<link>https://gunlab.net/weekend-update-3/</link>
		<comments>https://gunlab.net/weekend-update-3/#comments</comments>
		<pubDate>Mon, 16 Mar 2015 08:00:40 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[cnc router]]></category>
		<category><![CDATA[Gun rack]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[solid modeling]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>
		<category><![CDATA[weekend update]]></category>
		<category><![CDATA[wood shop]]></category>
		<category><![CDATA[wood working]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=3003</guid>
		<description><![CDATA[<p>First things first. I am dog beat tired. I will post pictures later about everything. Changes were made to the wood shop, solid models were done and a new rifle rack was worked on.</p> <p>So lets start at the beginning. Saturday was spent with the computer system that I could not get to work correctly [...]]]></description>
				<content:encoded><![CDATA[<p>First things first. I am dog beat tired. I will post pictures later about everything. Changes were made to the wood shop, solid models were done and a new rifle rack was worked on.</p>
<p>So lets start at the beginning. Saturday was spent with the computer system that I could not get to work correctly only to have my son come in on Sunday and not even find a problem. Make note to self to beat to death a computer for the computer gods.</p>
<p>I started redrawing for a new set of gun racks which will be finished this next week. The solid modeling just did not want to play nice. It took a number of tries to get it correct in an assembly. Pictures to come.</p>
<p>I also started working on drawings for a Volcanic pistol that I want to make some day. That also went to crap, it was just not a day for computer work.</p>
<p>I went to work on cleaning out the pantry and setting up the photographic area. It is amazing just how much junk I can accumulate on a single horizontal surface. With that completed I started on the rifle/pistol photograph stand. I have the remainder of the stand to complete this coming week when the missing components come in.</p>
<p>Sunday turn out a great deal more productive. I move out a great deal of equipment from the wood shop and installed a new CNC router. Wow, another machine to learn how to use. Half of dozen friends dropped by to say hi and it was nice to see them all. And the most exciting news, I made most of the new gun rack for the gun room.</p>
<p>This is it for now as I am done. I will be back tomorrow.</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/weekend-update-3/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Weekend update 11-17</title>
		<link>https://gunlab.net/weekend-update-11-17/</link>
		<comments>https://gunlab.net/weekend-update-11-17/#comments</comments>
		<pubDate>Mon, 17 Nov 2014 08:00:03 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[Gun rack]]></category>
		<category><![CDATA[machining]]></category>
		<category><![CDATA[Parts]]></category>
		<category><![CDATA[Parts fabrication]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[VG1-5]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>
		<category><![CDATA[weekend update]]></category>
		<category><![CDATA[wood shop]]></category>
		<category><![CDATA[wood working]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1828</guid>
		<description><![CDATA[<p>As always there is to much to do and not enough time to complete all of it. First is the update to the addition to the wood shop. The door is hung and the roof is up. The roof and sides are epoxy and fabric covered, for the most part. One more day and I [...]]]></description>
				<content:encoded><![CDATA[<p>As always there is to much to do and not enough time to complete all of it. First is the update to the addition to the wood shop. The door is hung and the roof is up. The roof and sides are epoxy and fabric covered, for the most part. One more day and I should have it complete. Here are a few pictures of the project as the end of Sunday.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2807s.jpg"><img class="aligncenter size-medium wp-image-1829" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2807s-200x300.jpg" alt="DSC_2807s" width="200" height="300" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2808s.jpg"><img class="aligncenter size-medium wp-image-1830" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2808s-200x300.jpg" alt="DSC_2808s" width="200" height="300" /></a>And a quick look inside. I still have the dust collector ducting, the air piping and the lighting circuit to complete. After all that is complete I will insulate,sheet and sheet rock.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2809s.jpg"><img class="aligncenter size-medium wp-image-1831" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2809s-200x300.jpg" alt="DSC_2809s" width="200" height="300" /></a>Talking about the wood shop. I was on a job and was chatting with the home owner and a piece of equipment in his garage and he gave it to me. So meet the new addition to the shop.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2810s.jpg"><img class="aligncenter size-medium wp-image-1832" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2810s-200x300.jpg" alt="DSC_2810s" width="200" height="300" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2811s.jpg"><img class="aligncenter size-medium wp-image-1833" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2811s-200x300.jpg" alt="DSC_2811s" width="200" height="300" /></a>It is a router table with a real nice Porter Cable router. It is funny that I just bought the same router last week for 309.00. I sold the new one to my neighbor today.</p>
<p>More work was completed on the rifle rack that I started a couple of weeks ago.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2823s.jpg"><img class="aligncenter size-medium wp-image-1834" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2823s-200x300.jpg" alt="DSC_2823s" width="200" height="300" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2824s.jpg"><img class="aligncenter size-medium wp-image-1835" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2824s-300x200.jpg" alt="DSC_2824s" width="300" height="200" /></a>I will cut the slots for the top and bottom hole this week and then set it up in the gun room.</p>
<p>I spent most of Saturday in a class on anodizing and I have a little write up on that in the future.</p>
<p>Last but not least I made a number of pieces for the stock washers. Simple parts but time consuming.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/11/DSC_2821ws.jpg"><img class="aligncenter size-medium wp-image-1836" src="http://gunlab.net/wp-content/uploads/2014/11/DSC_2821ws-300x200.jpg" alt="DSC_2821ws" width="300" height="200" /></a></p>
<p>I will chat with you all tomorrow.</p>
<p>\</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/weekend-update-11-17/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Mondays update 10-27</title>
		<link>https://gunlab.net/mondays-update-10-27/</link>
		<comments>https://gunlab.net/mondays-update-10-27/#comments</comments>
		<pubDate>Mon, 27 Oct 2014 20:41:31 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[CNC machining]]></category>
		<category><![CDATA[engineering design]]></category>
		<category><![CDATA[flutting machine]]></category>
		<category><![CDATA[machining]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[VG1-5]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1580</guid>
		<description><![CDATA[<p>With the SAR show coming up quick the main push at Gun Lab is to finish out the VG1-5 project. Not all the rifles will be built prior to SAR, but the parts will be completed and the first 3 rifles will be completed. That is my goal at least. So right now we are [...]]]></description>
				<content:encoded><![CDATA[<p>With the SAR show coming up quick the main push at Gun Lab is to finish out the VG1-5 project. Not all the rifles will be built prior to SAR, but the parts will be completed and the first 3 rifles will be completed. That is my goal at least. So right now we are going over every parts and finishing every detail as working on the barrel fluting press. To that end is what this post is about.  The first picture is of the front barrel support with its final locking notch cut in.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/10/DSC_2586sw.jpg"><img class="aligncenter size-medium wp-image-1582" src="http://gunlab.net/wp-content/uploads/2014/10/DSC_2586sw-300x200.jpg" alt="DSC_2586sw" width="300" height="200" /></a>The next picture is of the push pin that locks everything together. We needed to cut in a hole and slot for the retaining spring, still to be made.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/10/DSC_2589csw.jpg"><img class="aligncenter size-medium wp-image-1581" src="http://gunlab.net/wp-content/uploads/2014/10/DSC_2589csw-300x175.jpg" alt="DSC_2589csw" width="300" height="175" /></a>All the holes have been drilled and reamer on the lower 1/2 of the fluting back plate. The next components made for the fluting machine are the support and gussets for the 3 jaw chuck.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/10/DSC_2581sw.jpg"><img class="aligncenter size-medium wp-image-1585" src="http://gunlab.net/wp-content/uploads/2014/10/DSC_2581sw-200x300.jpg" alt="DSC_2581sw" width="200" height="300" /></a>and a side view of the same assembly.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/10/DSC_2583sw.jpg"><img class="aligncenter size-medium wp-image-1584" src="http://gunlab.net/wp-content/uploads/2014/10/DSC_2583sw-300x200.jpg" alt="DSC_2583sw" width="300" height="200" /></a>We also finished the lower support for the hydraulic cylinder.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/10/DSC_2579sw.jpg"><img class="aligncenter size-medium wp-image-1586" src="http://gunlab.net/wp-content/uploads/2014/10/DSC_2579sw-300x200.jpg" alt="DSC_2579sw" width="300" height="200" /></a>I hope to cut the slots and machine the sides parallel on the back plate in the next few days. Keep checking back for up dates.</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/mondays-update-10-27/feed/</wfw:commentRss>
		<slash:comments>5</slash:comments>
		</item>
		<item>
		<title>Monday update 10-13</title>
		<link>https://gunlab.net/monday-update-10-13/</link>
		<comments>https://gunlab.net/monday-update-10-13/#comments</comments>
		<pubDate>Tue, 14 Oct 2014 02:25:09 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[Interview]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1421</guid>
		<description><![CDATA[<p>Sorry for the lack of posting, however I have an excuse. I have been having to much fun visiting friends, taking pictures to post, looking at guns and learning about metals and heat treating. I have a pile of pictures for you, some great information on metals and a couple of interesting interviews. Now on [...]]]></description>
				<content:encoded><![CDATA[<p>Sorry for the lack of posting, however I have an excuse. I have been having to much fun visiting friends, taking pictures to post, looking at guns and learning about metals and heat treating. I have a pile of pictures for you, some great information on metals and a couple of interesting interviews. Now on to the rest of my trip. I will be posting everything when I get home as for now I an just having way to much fun. Tomorrow it is off to Ohio Ordnance, to look at some fun stuff.</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/monday-update-10-13/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Monday update 9-29</title>
		<link>https://gunlab.net/monday-update-9-29/</link>
		<comments>https://gunlab.net/monday-update-9-29/#comments</comments>
		<pubDate>Mon, 29 Sep 2014 08:00:40 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[Fab shop]]></category>
		<category><![CDATA[flutting machine]]></category>
		<category><![CDATA[honey do.]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[solid modeling]]></category>
		<category><![CDATA[tool design]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>
		<category><![CDATA[weekend update]]></category>
		<category><![CDATA[wood working]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1345</guid>
		<description><![CDATA[<p>The 1&#8243; steel plate that we cut up last weekend has been cut down to size and then sized in the HAAS to actual specs.</p> <p>This is all that is that is remaining of the steel sheet that we started with.</p> <p></p> <p>All of this material will be used on the fluting machine.This is what [...]]]></description>
				<content:encoded><![CDATA[<p>The 1&#8243; steel plate that we cut up last weekend has been cut down to size and then sized in the HAAS to actual specs.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0145_s.jpg"><img class="aligncenter size-medium wp-image-1311" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0145_s-200x300.jpg" alt="DSC_0145_s" width="200" height="300" /></a>This is all that is that is remaining of the steel sheet that we started with.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0180_s.jpg"><img class="aligncenter size-medium wp-image-1351" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0180_s-300x200.jpg" alt="DSC_0180_s" width="300" height="200" /></a></p>
<p>All of this material will be used on the fluting machine.This is what it looked like after its time in the HAAS and sized.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0173_s.jpg"><img class="aligncenter size-medium wp-image-1348" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0173_s-300x200.jpg" alt="DSC_0173_s" width="300" height="200" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0176_s.jpg"><img class="aligncenter size-medium wp-image-1349" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0176_s-300x200.jpg" alt="DSC_0176_s" width="300" height="200" /></a>I also had a piece of rough ground stock that is the correct size for the chuck backing plate.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0177_s.jpg"><img class="aligncenter size-medium wp-image-1350" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0177_s-300x200.jpg" alt="DSC_0177_s" width="300" height="200" /></a>A quick look at the chuck backing plate solid model<a href="http://gunlab.net/wp-content/uploads/2014/09/chuck-subplate-2.jpg"><img class="aligncenter size-medium wp-image-1362" src="http://gunlab.net/wp-content/uploads/2014/09/chuck-subplate-2-300x162.jpg" alt="chuck subplate 2" width="300" height="162" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/chuck-subplate-1.jpg"><img class="aligncenter size-medium wp-image-1361" src="http://gunlab.net/wp-content/uploads/2014/09/chuck-subplate-1-300x162.jpg" alt="chuck subplate 1" width="300" height="162" /></a>.</p>
<p>&nbsp;</p>
<p>The major back piece which is 9&#8243; wide and 48&#8243; long is cut over size and set on the 3 axis cnc mill.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0171_s.jpg"><img class="aligncenter size-medium wp-image-1346" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0171_s-300x200.jpg" alt="DSC_0171_s" width="300" height="200" /></a>We did a basic mark up on the plate to show where the initial bolt hole and reamed dowel pin holes are going. Then it was time to place the blocks under the plate and clamp it down. This first set up is just for drilling 6 holes.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0185_s.jpg"><img class="aligncenter size-medium wp-image-1359" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0185_s-300x200.jpg" alt="DSC_0185_s" width="300" height="200" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0184_s.jpg"><img class="aligncenter size-medium wp-image-1358" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0184_s-200x300.jpg" alt="DSC_0184_s" width="200" height="300" /></a></p>
<p>&nbsp;</p>
<p>The design has been changed to allow it to be held and located easier.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/flutting-machine-final-3.jpg"><img class="aligncenter size-medium wp-image-1196" src="http://gunlab.net/wp-content/uploads/2014/09/flutting-machine-final-3-300x176.jpg" alt="flutting machine final 3" width="300" height="176" /></a>This is the new back plate design.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/broaching-machine-backing-plate-revised-1.jpg"><img class="aligncenter size-medium wp-image-1363" src="http://gunlab.net/wp-content/uploads/2014/09/broaching-machine-backing-plate-revised-1-300x159.jpg" alt="broaching machine backing plate revised 1" width="300" height="159" /></a></p>
<p>We moved the bolts that attach the fluting press to the side of the hydraulic forging press closer together then we will also machine 3 reamed holes in it as well. The reason for moving the bolt holes together is that corresponds with the table on the cnc mill. Now with this design I can machine the 6 holes and 3 reamer holes as a first op. then bolt the plate directly to the table of the mill and machine the sides and drill, ream and tape the rest of the holes without fear of movement.</p>
<p>Most of Sunday was spent doing honey do&#8217;s  The fixtures are in place in the hall bathroom and it is ready for use again. A few small things left to do, but that is for another weekend.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0213_s.jpg"><img class="aligncenter size-medium wp-image-1370" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0213_s-200x300.jpg" alt="DSC_0213_s" width="200" height="300" /></a>Last night a heavy rain storm came through the valley.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0191+s.jpg"><img class="aligncenter size-medium wp-image-1357" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0191+s-300x200.jpg" alt="DSC_0191+s" width="300" height="200" /></a></p>
<p>This is a quick video of the storm.</p>
<p><span class='embed-youtube' style='text-align:center; display: block;'><iframe class='youtube-player' type='text/html' width='640' height='390' src='https://www.youtube.com/embed/ZtzegsIGxmI?version=3&#038;rel=1&#038;fs=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;wmode=transparent' frameborder='0' allowfullscreen='true'></iframe></span></p>
<p>In it&#8217;s wake it left 1&#8243; or so of rain. That brings the total to 6&#8243; for the last month.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0208_sw.jpg"><img class="aligncenter size-medium wp-image-1371" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0208_sw-300x259.jpg" alt="DSC_0208_sw" width="300" height="259" /></a>My little rain gauge.</p>
<p>The project for the rest of Sunday is to build a new gun rack for my gun room. This is the solid model.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/4-FT-GUN-RACK.jpg"><img class="aligncenter size-medium wp-image-1367" src="http://gunlab.net/wp-content/uploads/2014/09/4-FT-GUN-RACK-300x148.jpg" alt="4 FT GUN RACK" width="300" height="148" /></a>It is 4 foot across and will hold 15 rifles. Here is where it is going in the room.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0214_s.jpg"><img class="aligncenter size-medium wp-image-1365" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0214_s-300x200.jpg" alt="DSC_0214_s" width="300" height="200" /></a>This is as far as I got today. It is 5pm and time to relax a bit and I will finish it off next weekend.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0211_s.jpg"><img class="aligncenter size-medium wp-image-1366" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0211_s-300x200.jpg" alt="DSC_0211_s" width="300" height="200" /></a>That is it for the weekend update. Until Tuesday.</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/monday-update-9-29/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Monday update 9-22</title>
		<link>https://gunlab.net/monday-update-9-22/</link>
		<comments>https://gunlab.net/monday-update-9-22/#comments</comments>
		<pubDate>Mon, 22 Sep 2014 08:00:46 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[Fab shop]]></category>
		<category><![CDATA[flutting machine]]></category>
		<category><![CDATA[honey do.]]></category>
		<category><![CDATA[hot forging press]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[Shop tours]]></category>
		<category><![CDATA[solid modeling]]></category>
		<category><![CDATA[tool design]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>
		<category><![CDATA[weekend update]]></category>
		<category><![CDATA[welding and cutting]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1259</guid>
		<description><![CDATA[<p>Well the fab shop new addition is now framed up and ready for a concrete pour. With any luck I will have the concrete completed in October.</p> <p></p> <p></p> <p></p> <p>This weekend is also honey-do weekend as well. The tile needed to put down in the hallway and bathroom and the new lighting installed. This [...]]]></description>
				<content:encoded><![CDATA[<p>Well the fab shop new addition is now framed up and ready for a concrete pour. With any luck I will have the concrete completed in October.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0103_s.jpg"><img class="aligncenter size-medium wp-image-1287" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0103_s-300x200.jpg" alt="DSC_0103_s" width="300" height="200" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0105_s.jpg"><img class="aligncenter size-medium wp-image-1289" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0105_s-300x200.jpg" alt="DSC_0105_s" width="300" height="200" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0104_s.jpg"><img class="aligncenter size-medium wp-image-1288" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0104_s-300x200.jpg" alt="DSC_0104_s" width="300" height="200" /></a></p>
<p>This weekend is also honey-do weekend as well. The tile needed to put down in the hallway and bathroom  and the new lighting installed. This is by the end of Friday night.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0100_s.jpg"><img class="aligncenter size-medium wp-image-1261" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0100_s-200x300.jpg" alt="DSC_0100_s" width="200" height="300" /></a>This is the progress by Saturday night.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0106_s.jpg"><img class="aligncenter size-medium wp-image-1293" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0106_s-300x200.jpg" alt="DSC_0106_s" width="300" height="200" /></a>And the progress in the bathroom.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0107_s.jpg"><img class="aligncenter size-medium wp-image-1294" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0107_s-300x200.jpg" alt="DSC_0107_s" width="300" height="200" /></a>This is the end at Sunday night for the hall.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0149_s.jpg"><img class="aligncenter size-medium wp-image-1323" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0149_s-200x300.jpg" alt="DSC_0149_s" width="200" height="300" /></a>And the bathroom.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0150_s.jpg"><img class="aligncenter size-medium wp-image-1324" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0150_s-300x200.jpg" alt="DSC_0150_s" width="300" height="200" /></a></p>
<p>&nbsp;</p>
<p>The hall lighting was installed as well.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0102_s.jpg"><img class="aligncenter size-medium wp-image-1262" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0102_s-300x200.jpg" alt="DSC_0102_s" width="300" height="200" /></a></p>
<p>&nbsp;</p>
<p>The fun task is the solid works class that we put on for my friend from Texas. He is scheduled for a stop over here for a couple of days with his job, so it is time to learn and do a project. In this case we are working on the fluting press and a set of back grips for his semi 1919.</p>
<p>More work has been completed on the Japanese 99 magazine.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0007_s1.jpg"><img class="aligncenter size-medium wp-image-1269" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0007_s1-300x200.jpg" alt="DSC_0007_s" width="300" height="200" /></a>We are also working in the fab shop. There is a lot to be completed in here to allow me to go forward with the projects. The first item completed is the band for the bracket to hold up the vent exhaust tube for the forge area.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0108_s1.jpg"><img class="aligncenter size-medium wp-image-1296" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0108_s1-300x200.jpg" alt="DSC_0108_s" width="300" height="200" /></a>And a close up.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0109_s.jpg"><img class="aligncenter size-medium wp-image-1297" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0109_s-200x300.jpg" alt="DSC_0109_s" width="200" height="300" /></a></p>
<p>After the clamp the supports were made.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0115_s.jpg"><img class="aligncenter size-medium wp-image-1299" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0115_s-300x200.jpg" alt="DSC_0115_s" width="300" height="200" /></a></p>
<p>The complete assembly up and in place.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0116_s.jpg"><img class="aligncenter size-medium wp-image-1300" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0116_s-300x200.jpg" alt="DSC_0116_s" width="300" height="200" /></a></p>
<p>Now with the tube installed.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0119_s.jpg"><img class="aligncenter size-medium wp-image-1301" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0119_s-300x200.jpg" alt="DSC_0119_s" width="300" height="200" /></a>On to the next project. I have a section of 1&#8243; steel plate that has a few supports welded on it. This will be cut up and machined for the necessary components needed for the fluting machine.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0110_s1.jpg"><img class="aligncenter size-medium wp-image-1302" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0110_s1-300x200.jpg" alt="DSC_0110_s" width="300" height="200" /></a>A little close up of the welded supports.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0111_s.jpg"><img class="aligncenter size-medium wp-image-1303" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0111_s-300x200.jpg" alt="DSC_0111_s" width="300" height="200" /></a>After all the supports are removed and ground the plate looks like this. A simple project that tool several hours and was way to much fun. This was accomplished with a cutting torch and a couple of grinders.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0129_s.jpg"><img class="aligncenter size-medium wp-image-1304" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0129_s-300x200.jpg" alt="DSC_0129_s" width="300" height="200" /></a>Then it was time to lay out for the necessary parts. This next phase of the project was completed by the world famous MacGuyver</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0130_s.jpg"><img class="aligncenter size-medium wp-image-1305" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0130_s-300x200.jpg" alt="DSC_0130_s" width="300" height="200" /></a>A special welding guide was made up for a straight cut.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0132_s.jpg"><img class="aligncenter size-medium wp-image-1306" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0132_s-300x200.jpg" alt="DSC_0132_s" width="300" height="200" /></a>Starting the cutting operation.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0133_s.jpg"><img class="aligncenter size-medium wp-image-1307" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0133_s-300x200.jpg" alt="DSC_0133_s" width="300" height="200" /></a>All the cutting was done on my home made cutting bench.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0139_s.jpg"><img class="aligncenter size-medium wp-image-1309" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0139_s-300x200.jpg" alt="DSC_0139_s" width="300" height="200" /></a>The cut part way through.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0137_s.jpg"><img class="aligncenter size-medium wp-image-1308" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0137_s-300x200.jpg" alt="DSC_0137_s" width="300" height="200" /></a>A couple of looks at the completed cut slab.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0144_s.jpg"><img class="aligncenter size-medium wp-image-1310" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0144_s-300x200.jpg" alt="DSC_0144_s" width="300" height="200" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0145_s.jpg"><img class="aligncenter size-medium wp-image-1311" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0145_s-200x300.jpg" alt="DSC_0145_s" width="200" height="300" /></a>From here it will be cut on the saw for the correct lengths and milled for proper size. That task will be completed this next week.</p>
<p>Here is a quick video of the torch cutting operation.</p>
<p><span class='embed-youtube' style='text-align:center; display: block;'><iframe class='youtube-player' type='text/html' width='640' height='390' src='https://www.youtube.com/embed/gFAEVy9nGHo?version=3&#038;rel=1&#038;fs=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;wmode=transparent' frameborder='0' allowfullscreen='true'></iframe></span></p>
<p>The rest of the honey do list was tackled. Last weekend we drilled hole in the frame of the walk in cooler and injected foam to act as a thermal barrier. I might have got a little carried away with the foam.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0034_s.jpg"><img class="aligncenter size-medium wp-image-1312" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0034_s-200x300.jpg" alt="DSC_0034_s" width="200" height="300" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0035_s.jpg"><img class="aligncenter size-medium wp-image-1313" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0035_s-200x300.jpg" alt="DSC_0035_s" width="200" height="300" /></a>After a week of removing the excessive foam and sanding the frame we painted it again.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0146_s.jpg"><img class="aligncenter size-medium wp-image-1314" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0146_s-200x300.jpg" alt="DSC_0146_s" width="200" height="300" /></a>Once we got started with painting we just finished everything that needed to be done.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0148_s.jpg"><img class="aligncenter size-medium wp-image-1315" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0148_s-200x300.jpg" alt="DSC_0148_s" width="200" height="300" /></a></p>
<p>Time to go back to the fab shop for some more fun. More work was completed on the hot forging press. The hydraulic manifold was welded on.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0124_s.jpg"><img class="aligncenter size-medium wp-image-1316" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0124_s-200x300.jpg" alt="DSC_0124_s" width="200" height="300" /></a>And the brackets for the piping were welded on as well.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/DSC_0126_s.jpg"><img class="aligncenter size-medium wp-image-1317" src="http://gunlab.net/wp-content/uploads/2014/09/DSC_0126_s-200x300.jpg" alt="DSC_0126_s" width="200" height="300" /></a></p>
<p>Enough fun for the this weekend.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/monday-update-9-22/feed/</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
		<item>
		<title>Weekend update</title>
		<link>https://gunlab.net/weekend-update/</link>
		<comments>https://gunlab.net/weekend-update/#comments</comments>
		<pubDate>Tue, 02 Sep 2014 13:15:09 +0000</pubDate>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
				<category><![CDATA[flutting machine]]></category>
		<category><![CDATA[machining]]></category>
		<category><![CDATA[Parts fabrication]]></category>
		<category><![CDATA[shop tools]]></category>
		<category><![CDATA[tool design]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[VG1-5]]></category>
		<category><![CDATA[Weekend follow up Monday]]></category>
		<category><![CDATA[weekend update]]></category>

		<guid isPermaLink="false">http://gunlab.net/?p=1087</guid>
		<description><![CDATA[<p>Most of Saturday morning was spent on another solid model. The actual projects that were accomplished were finishing the knurling tool and get back on the VG1-5 knurling project.</p> <p>So first on the list is the knurling tool. I have one that I bought form Shars. I just did not like it. It moved to [...]]]></description>
				<content:encoded><![CDATA[<p>Most of Saturday morning was spent on another solid model. The actual projects that were accomplished were finishing the knurling tool and get back on the VG1-5 knurling project.</p>
<p>So first on the list is the knurling tool. I have one that I bought form Shars. I just did not like it. It moved to much and made me very nervous when I was using it up close to the chuck on my lathe. It would move when ever it wanted and most of the time not when I wanted it to. So my neighbor and I design one, wrote the programs for the Allen-Bradley and then finished it off this last week.</p>
<p>Here are a few pictures of the build process.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/08/IMG_2272_s.jpg"><img class="aligncenter size-medium wp-image-1093" src="http://gunlab.net/wp-content/uploads/2014/08/IMG_2272_s-300x199.jpg" alt="IMG_2272_s" width="300" height="199" /></a></p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/08/IMG_2281_s.jpg"><img class="aligncenter size-medium wp-image-1095" src="http://gunlab.net/wp-content/uploads/2014/08/IMG_2281_s-300x199.jpg" alt="IMG_2281_s" width="300" height="199" /></a></p>
<p>&nbsp;</p>
<p>This after the jaw was machined and we put it in the web milling machine to cut off the back side. I have a complete post for later in this week.</p>
<p>Sunday was spent playing with my new Nikon 5300 series camera. I have also started a night class at the local college on digital photography. I did a basic video with a voice over to test its capability.</p>
<p><span class='embed-youtube' style='text-align:center; display: block;'><iframe class='youtube-player' type='text/html' width='640' height='390' src='https://www.youtube.com/embed/VUtXbwYUmMY?version=3&#038;rel=1&#038;fs=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;wmode=transparent' frameborder='0' allowfullscreen='true'></iframe></span></p>
<p>The rest of the time was spent with working out the design of the chamber fluting machine for the VG1-5 and other barrels.</p>
<p><a href="http://gunlab.net/wp-content/uploads/2014/09/flutting-machine_3_s.jpg"><img class="aligncenter size-medium wp-image-1100" src="http://gunlab.net/wp-content/uploads/2014/09/flutting-machine_3_s-300x166.jpg" alt="flutting machine_3_s" width="300" height="166" /></a>The design is in it final stages and I will post on this tomorrow.</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>https://gunlab.net/weekend-update/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>
