<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>Comments on: Monday follow up 9-15 work on the fab shop</title>
	<atom:link href="http://gunlab.net/monday-follow-up-part-2-9-15/feed/" rel="self" type="application/rss+xml" />
	<link>http://gunlab.net/monday-follow-up-part-2-9-15/</link>
	<description>Adventures in gun building!</description>
	<lastBuildDate>Sat, 11 Apr 2026 23:49:22 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.1.41</generator>
	<item>
		<title>By: Chuck</title>
		<link>http://gunlab.net/monday-follow-up-part-2-9-15/#comment-2654</link>
		<dc:creator><![CDATA[Chuck]]></dc:creator>
		<pubDate>Tue, 16 Sep 2014 01:43:23 +0000</pubDate>
		<guid isPermaLink="false">http://gunlab.net/?p=1209#comment-2654</guid>
		<description><![CDATA[Thanks Harry. I hope to pour the shop floor in a couple of weeks. I really need the space.]]></description>
		<content:encoded><![CDATA[<p>Thanks Harry. I hope to pour the shop floor in a couple of weeks. I really need the space.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Harry Connors</title>
		<link>http://gunlab.net/monday-follow-up-part-2-9-15/#comment-2647</link>
		<dc:creator><![CDATA[Harry Connors]]></dc:creator>
		<pubDate>Mon, 15 Sep 2014 15:01:49 +0000</pubDate>
		<guid isPermaLink="false">http://gunlab.net/?p=1209#comment-2647</guid>
		<description><![CDATA[I had water in our Arizona room here in Tucson last week, the shop and large garage are on a 16 inch foundation with half under ground so we did not get any water in there. But we spend the week assisting the contractors in digging the yard up as it had a 1 to 4 slope towards the house. Cannot believe the previous owner paid someone to do the yard that way. Anyway 20 tons of gravel and a new underground drainage system later it is done. Hopefully it will work for the storms scheduled to arrive this week. Great work on the shop. Harry]]></description>
		<content:encoded><![CDATA[<p>I had water in our Arizona room here in Tucson last week, the shop and large garage are on a 16 inch foundation with half under ground so we did not get any water in there. But we spend the week assisting the contractors in digging the yard up as it had a 1 to 4 slope towards the house. Cannot believe the previous owner paid someone to do the yard that way. Anyway 20 tons of gravel and a new underground drainage system later it is done. Hopefully it will work for the storms scheduled to arrive this week. Great work on the shop. Harry</p>
]]></content:encoded>
	</item>
</channel>
</rss>
